GREEN MAGICUBE
2 kWh
Home storage group
The smaller storage-capacity option in the Green Magicube range. Discuss your household requirements to establish the right system configuration.
Enquire about 2 kWh →ENERGY. CONSIDERED.
Every household uses energy differently. Green Magicube introduces two storage-capacity options as a starting point for conversations about your home, existing solar installation and energy priorities.
GREEN MAGICUBE
Home storage group
The smaller storage-capacity option in the Green Magicube range. Discuss your household requirements to establish the right system configuration.
Enquire about 2 kWh →GREEN MAGICUBE
Home storage group
The larger storage-capacity option in the Green Magicube range. Discuss your energy-use pattern and installation requirements before selecting a system.
Enquire about 5 kWh →kWh describes stored energy, not output power. Usable capacity, inverter output, battery chemistry, dimensions, certifications, warranty, pricing and availability are to be confirmed in the product specification. No runtime or savings estimate is implied by these capacity options.
UK HOME CONNECTION PLANNING
Planning a household storage project in England, Scotland, Wales or Northern Ireland? Start by identifying the electricity network serving your address. Your network operator manages the local wires; it is different from the supplier that bills you.
This section outlines a future connection-planning framework, not an available installation service. Green Magicube has not yet obtained grid-connection certification. Equipment verification, certification, installer arrangements and network permissions must be completed before any grid-connected deployment. No network-operator partnership is claimed.
| Indicative area | Network operator |
|---|---|
| London, East and South East England | UK Power Networks |
| Midlands, South West England and South Wales | National Grid Electricity Distribution |
| North East England and Yorkshire | Northern Powergrid |
| North West England | SP Electricity North West |
| Central and Southern Scotland, North Wales, Merseyside and Cheshire | SP Energy Networks |
| Northern Scotland and Southern England | Scottish and Southern Electricity Networks (SSEN) |
| Northern Ireland | NIE Networks |
Regional descriptions are a guide only. Some properties are served by an independent network operator. Confirm the operator by postcode and the property's supply details. Find your network operator.
Capacity is not connection permission. A 2 kWh or 5 kWh battery label alone does not establish eligibility for a particular grid-connection route. Inverter power, existing generation and the proposed installation also matter.
Official guidance checked 29 October 2026: network areas · GOV.UK device registration guidance · NIE Networks. Requirements must be checked for the final design; approval and installation are not guaranteed.
OUR DEVELOPMENT PLAN
Green Magicube is at the brand and commercial feasibility stage. We are exploring 2 kWh and 5 kWh home storage concepts, with product specifications, supplier costs, certification and installation arrangements still to be validated.
UK government statistics record 44,033 MCS-certified battery installations in existing homes in the 2025/26 financial year, compared with 24,242 in 2024/25. Within the cleaned 2025/26 sample, 16,270 installations were in the 1–5.99 kWh capacity band.
These figures cover registered domestic retrofit installations, not the entire UK battery market. Changes may reflect both installation activity and registration coverage. They do not establish demand, profitability or performance for Green Magicube. Source: DESNZ / MCS statistics, published 28 May 2026.
Current availability: brand and commercial enquiries only. Grid-connection certification has not yet been obtained. No product orders, deposits or grid-connected installation bookings are being accepted. Launch timing, pricing, savings and returns are not confirmed.
Discuss development or partnership →Business overview updated 29 October 2026.
Compatibility depends on the selected battery, inverter and existing installation. Share your system details for a project discussion; compatibility has not been confirmed for any specific equipment.
Backup operation requires a suitable system design and installation. It is not confirmed as a feature of these options.
Green Magicube is currently at the brand and business planning stage. Grid-connection certification has not yet been obtained. Products are not currently offered for order or grid-connected installation. Contact Maxwell Style about development or commercial collaboration.
LET'S START WITH YOUR HOME
Tell us your UK region, whether you already have solar panels, and which storage capacity interests you. Homeowners, installers and distribution partners are welcome to enquire.
Discuss Green Magicube →Green Magicube · A Maxwell Style brand project · Updated 29 October 2026